咨询热线:18612144949

新闻中心

软膜天花安装底架制作的注意事项

2018-03-07 20:49

软膜天花安装底架制作的注意事项

软膜天花安装的第一部分就是:底架制作,那么底架制作有哪些注意事项,以下说明。

  首先要了解哪些地方需要制作底架?

  需要制作底架的部分:造型天花骨架部分、风口、喷淋、烟感、筒灯、喇叭口等。

  不同类型的龙骨,底架制作不相同

  a.F码龙骨底架制作

  F码宽2.5cm,高1.8cm,宽面与底架相接。底架若以木方制作要用宽2.5cm,厚3cm的木方,龙骨与底架用自攻螺丝打紧;若用方通管,一般用25*25规格。不管木方或方通管都要固定在混凝土墙面上,做到够力不脱落。以上为平面天花的底架制作。如果要做异型的天花,则在装F码龙骨的位置,底架要先作出异型的走势,F码龙骨只装在每块的收边位置。
  b. 扁码龙骨底架制作
  扁码宽1cm,高3.2cm,高面与底架相接。如果墙面为木夹板,则可以直接用扁码龙骨固定,不需要做F码的底架,但扁码与之相固定的位置必须为木制夹板或空心方通管。
  c. 双扣码龙骨底架制作
  双扣码宽4cm,高1.8cm,宽面与底架相接。双扣码底架如果用木制作,宽达到4cm,厚度至少要1cm;若用方通管制作,用35*25方通,35面与双扣码4cm面用铆钉紧固。双扣码作用是连接两块软膜,可以做异型等,所以其底架也应做相应的异型,依图纸制作造型。
  底架制作所需主要工具:
  脚手架、梯子、冲击钻、手钢锯、打磨机、胶钳、铁锤、卷尺、铅笔、墨斗线、水平仪、扳手、电源线、安全帽、安全带等

Soft film smallpox is the smallpox adornment material that more popular in recent years, by the base, keel, soft membrane three parts make up.
Installation steps of soft film smallpox:
Bottom frame production - ordering --- --- --- --- --- --- --- --- --- --- --- --- --
The first part of the installation of soft membrane smallpox is: the bottom frame is made, so the bottom frame production has what attention matters, the following explanation.
First of all, what needs to be done?
The part that needs to make the base frame: the shape smallpox skeleton part, the tuyere, the spray, the smoke, the tube lamp, the bell mouth and so on.
Different types of keel, bottom frame production is different.
A.F code keel base.
The F code is 2.5cm wide, 1.8cm high, and the width is connected with the base frame. If the base frame is made of wood, it shall be 2.5cm wide and 3cm thick. If you use a square pipe, you usually use 25*25 specifications. No matter the wooden or square pipe should be fixed on the concrete wall, do not fall off. The above is the base frame of planar smallpox. If you want to make a different type of smallpox, then the position of the F code keel, the bottom frame should make the trend of the different type first, the F code keel is only installed in the side position of each piece.
B. The base frame of flat bar is made.
The flat code is 1cm wide and 3.2cm high, and the high surface is connected with the base frame. If metope is wooden splint, can use flat code keel to be fixed directly, do not need to make the base of F code, but the position that is fixed with the flat code must be wooden splint or hollow square conduit.
C. Double buckled keel base frame production.
The double button width is 4cm, 1.8cm high, and the width is connected with the base frame. If the double buckles are made of wood, the width is 4cm and the thickness is at least 1cm. If you use square control, 35*25 square, 35 face and double button 4cm face with rivets. The double button function is to connect two soft membranes, and can do different types, so the base frame should also make the corresponding abnormity, according to the drawing.
Main tools for the production of base frame:
Scaffolds, ladders, percussion drills, hand hacksaw, sanding machine, glue pliers, hammer, tape measure, pencil, ink pipe line, horizontal instrument, wrench, power cord, safety helmet, seat belt, etc.

 

点击这里给我发消息点击这里给我发消息

友情链接/LINKS

北京管道疏通 燕郊搬家公司 北京卷帘门 杭州发电机出租 干拌复合轻集料混 给水泵 北京伸缩门 移动厕所 百度地图 网站地图